Skip to content

Handover

Question about the manual? Ask Claude · Ask ChatGPT

The handover is the moment the property actually passes to the tenant: you agree on a date, walk through the apartment together, record the condition, meters and keys, sign and send the protocol. If tenant and landlord later disagree about the deposit or damage, this protocol decides the matter.

  1. Open the tenancy and click Start Handover in the header. The button only appears if your company has the Handover Phase switch turned on. If your company uses a tenancy agreement phase, the tenancy must first be in the Tenancy Agreement phase; otherwise the New phase is enough.
  2. The tenancy is now in the Handover phase. The Checklist tab shows the Handover group with the open items.

Header of a tenancy with the “Start Handover” button

  1. On the tenancy, click the Appointments button or open the Handover Appointments tab, then click New Handover Appointment.
  2. In the appointment form, check Responsible and Duration (Minutes). SMARTBRIX suggests the person responsible for the property and 60 minutes.
  3. Click Create Proposals. SMARTBRIX builds three dates from the responsible user’s handover times: at most one per day, never today, within a window around the start of the tenancy.
  4. Check the proposals on the Proposals tab. The Calendar Conflict column marks times when the responsible user’s calendar already has an entry. You can overwrite Start and End or add rows of your own.
  5. Click Send Proposals. Each contract partner with an email address receives an email of their own, and the appointment changes to Proposed.
  6. Record the answer. If the tenant replies by phone or email, click Record as Chosen in the proposal row, or enter Agreed Start or Counter Proposal by hand.
  7. Click Confirm. The appointment changes to Confirmed, the calendar entry is created and the confirmation email goes out.
  8. On the confirmed appointment, click Create Protocol. The protocol is created with the date and time of the appointment, already prefilled, and opens.

The “Handover Appointments” tab with a confirmed handover appointment

Appointment form with the “Proposals” tab

Email “Appointment for the handover of your home” with three dates in the history of the appointment

Confirmed appointment with the “Create Protocol” button

  1. In the header of the protocol, check Direction, Date and Time, Place and Recorded By. The place is prefilled from the property address and can be changed.
  2. Click Prepare if you did not create the protocol from the appointment. It takes participants, rooms with their furnishings, furnishings without a room, meters and keys from the property. A second click only adds what is missing.
  3. Tick Include Shared Rooms if the staircase, laundry room and similar areas are to be included, and click Prepare again.
  4. Check the Participants tab. The contract partners are prefilled as Tenant and the person responsible for the property as Property Manager, each with Signs ticked. If no contract partner is entered, the invoice recipient appears as Tenant, the same person who receives the appointment email. Add further roles such as Witness or Authorised Representative. The Signature column shows each person’s status (Pending, Signed, Refused, Represented, Absent). It stays empty in the draft, because the signature rows are only created when you finalize the protocol.
  5. Go through the items on the Rooms and Features tab. Rooms appear in bold, their furnishings indented below. For each row, set Condition and, for residential space, Renovation State, and write anything notable in Note.
  6. Add photos in the Photos column. Each row has two buttons: Take Photo opens the camera directly on a tablet or smartphone, Choose Picture opens the media library, where you can select several pictures at once. On a computer, both open the file dialog. The Defects and Meters tabs have the same buttons.
  7. If a room or a furnishing is missing, create it on the property directly with the button in the row. Besides the rooms of the apartment, the Room column also offers those of the building, such as the staircase or the cellar.
  8. Record deviations on the Defects tab: Description, Room, Feature, Caused By (Tenant, Landlord or Open), Trade, Consequence and, where a deadline applies, Deadline. If the tenant declares a reservation, tick Reservation.
  9. On the Meters tab, enter Reading and Reading Date in each row. If you have compared the number on the device with the one on file, tick Meter Number Confirmed.
  10. On the Keys tab, check the Handed Out column and correct the quantities that are actually handed over. Tick Handout Confirmed as soon as you have counted the keys on site. The quantity is already filled in from the key stock of the property. Only this tick counts toward the progress and books the keys out when you finalize the protocol.
  11. Record agreements on the Remarks tab. If you choose a ready-made text in the Template column, Subject and Text fill in automatically and can still be changed.
  12. Under Reservation, enter what the tenant declares for the protocol as a whole.

Protocol in draft with header data, references and progress bars

The “Participants” tab with the signature status

The “Rooms and Features” list with indented furnishings

The “Defects” tab

The “Meters” tab

The “Keys” tab

The “Remarks” tab

The same protocol on a tablet

First page of the blank protocol

  1. Click Finalize and confirm the message. The protocol is then frozen.
  2. Click Signatures. The signature rows open on a page of their own, so the tablet can be passed from hand to hand.
  3. Have each participant sign in their row. If someone refuses to sign, set their Status to Refused and fill in Reason for Refusal and Witness. If someone is not present, set Absent; if someone is represented, set Represented and fill in Represented By.
  4. As soon as every row has one of these states, the protocol changes to Fully Signed. If at least one person signed, on site or through the signature link, the signed copy is created automatically: the protocol again as a PDF, with the signatures. You find it in the Frozen Document group in the Signed Protocol PDF field.
  5. Click Send. The Send Protocol window shows one row per signer. Check the Mail Template, choose the channel for each recipient and click Send.
  6. If something is handed in later, enter it on the Addenda tab: Subject, Text and, for a key handed over later, Key Line and Subsequently Delivered. The frozen protocol stays as it was.

Signing through the e-signature app is not available in the Light / Pro plan. You can still have the protocol signed on site or through the signature link.

Confirmation dialog when finalizing

The “Frozen Document” group

Signature page with the signature field

The “Send Protocol” window

The “Addenda” tab

First page of the printed handover protocol

For residential space, the tenant needs a landlord certificate (Wohnungsgeberbestätigung) to register the new address. You create it on the tenancy from the Actions menu, sign it and hand it to the tenant. How this works and what the sheet contains is described in Landlord certificate.

  1. Open the Checklist tab and work through the Handover group. Each row shows Checkpoint, Progress and Note.
  2. The items are Handover protocol finalized, Opening readings, Keys handed over, Deposit received and, for residential space, Landlord certificate. Anything the property does not have is left out of the list. The Landlord certificate row shows its deadline as “due” with the date. Once the deadline has passed, “overdue” appears next to it.
  3. For Deposit received, compare the progress with the agreed deposit and, with an installment plan, the first installment in the note next to it. If a certificate was agreed, the item is called Deposit certificate received and is done when the certificate arrives. If no deposit was agreed, the row stays in the list, the progress stays empty and the note reads “not required: no deposit was agreed”.
  4. Finally, click Activate. The tenancy moves to the Active phase.

The “Checklist” tab with the “Handover” group

Appointment

  • At the set Handover Appointment Lead Time (Days), a daily run creates the activity “Schedule handover appointment” for the person responsible for the property, as long as no appointment is open. It only asks; it does not send anything.
  • Send Proposals sends the email “Appointment for the handover of your home”, a separate one to each recipient, in their language. It lists the dates with weekday and time span, plus place, duration and contact person.
  • Confirm sends the email “Your appointment for the handover of your home” and creates a calendar entry “Handover:” with the property for the responsible user. The attendees are the contract partners and the responsible user. No second invitation email is sent; this is intentional.
  • Choice, counter proposal and confirmation each leave a note in the history of the appointment. If you entered the answer yourself, the note says “Recorded by the property manager:” instead of “The tenant chose …”.

Protocol

  • When the protocol is created, it is immediately prefilled with the data of the property. The date comes from the appointment.
  • The place is set from the property address when the protocol is created. A place set by hand is never overwritten.
  • Finalize creates, in this order, the opening meter readings, the key movements, the signature rows and then the protocol PDF and, if there are photos, the photo documentation. Both files get a checksum.
  • A meter row becomes a meter reading if it has a value or if Meter Number Confirmed is ticked. This way a genuine reading of 0 can still be recorded.
  • At handover, a key row becomes a key movement if Handout Confirmed is ticked and a quantity is filled in. The prefilled quantity alone books nothing, and the PDF also only shows the confirmed quantity.
  • A meter reading in a service charge period that has already been settled is rejected.
  • After finalizing, the header and rows cannot be changed. Only the signatures, addenda and sending fields remain editable. A finalized protocol cannot be deleted.
  • The protocol and photo documentation are then attached to the documents of the tenancy, later also the signed copy, and, if your system has document management, filed in the folder of the usage.
  • Send sends the frozen protocol, the photo documentation and, once it exists, the signed copy. The protocol then changes to Sent.
  • An addendum with a key line and quantity books the quantity on the key movement afterwards. The shortfall on the protocol remains, because that is what the document stated on that day.
  • Photos are deleted after the period set in Protocol Photo Retention (Months), counted from the end of the tenancy. The protocol PDF and the signed copy are kept permanently.

Checklist and phase

  • A finalized protocol also completes the checklist items for meters and keys in its direction.
  • The Landlord certificate item is due 14 days after the move-in date. It is done as soon as the certificate is created and then shows “issued” with the date. It does not block anything and does not appear at all for commercial units.
  • If the company switch Protocol Required (Handover and Move-out) is on, the tenancy cannot leave the Handover phase toward Active without a finalized protocol. This also applies to clicking in the status bar. If the switch is off, the item is for information only.
  • The Deposit received item is for information only. It does not block the move to Active.
  • Once the handover is fully recorded, the daily run moves the tenancy to Active automatically.

with customer portal What the tenant sees in the portal

  • A Choose a date button in the proposal email takes the tenant to their appointment page. They do not need an account for this.
  • The page is headed Handover appointment, followed by Property, Contact and Duration.
  • Under “Please pick one of the dates, or suggest another one.” there is a row for each proposal with the Choose this date button.
  • If none suits them, they fill in Your date and time and Note (optional) under “None of the dates suits you? Suggest another one.” and click Suggest this date.
  • After choosing a date, they read “Thank you. We have noted your choice and will confirm the appointment.”; after a counter proposal, “Thank you. We have noted your suggestion and will get back to you.”
  • Once the appointment is confirmed, the page shows Agreed appointment with the Confirmed label. The tenant can then no longer choose. If the appointment is canceled, the page shows “This appointment is no longer open. Please contact your property management.”
  • On the page of their tenancy, the confirmed appointment appears in the Before you move in card in the Handover appointment row.
  • If you send them a signature link, they open the Your protocol page. It shows Appointment, Place, a readable preview of the protocol and below it the files Protocol and Photo documentation for download. Below the preview it says “Please read the document before you sign. What you sign is exactly this file.”
  • On the right they find the Your signature card with Signed on behalf of, their name and the Sign protocol button. Afterwards they read “Thank you!” and “Your signature has been recorded.”
  • After sending, the protocol and photo documentation stay in the Documents card on the page of their tenancy, under the headings Protocols, Photo documentation and Landlord certificate. The most recent protocol is also shown there as a readable preview.

Tenant’s appointment page with three proposals

Appointment page after choosing, with the success message

The “Your protocol” page with the “Your signature” card

The “Documents” card

Didn't find an answer? Contact support